Ali, A K (2019) A case study in developing an interdisciplinary learning experiment between architecture, building construction, and construction engineering and management education. Engineering, Construction and Architectural Management, 26(09), 2040–59.

Chan, D W, Olawumi, T O and Ho, A M (2019) Critical success factors for building information modelling (BIM) implementation in Hong Kong. Engineering, Construction and Architectural Management, 26(09), 1838–54.

Chen, Y, Yin, Y, Browne, G J and Li, D (2019) Adoption of building information modeling in Chinese construction industry. Engineering, Construction and Architectural Management, 26(09), 1878–98.

Gao, J, Ren, H and Cai, W (2019) Risk assessment of construction projects in China under traditional and industrial production modes. Engineering, Construction and Architectural Management, 26(09), 2147–68.

Iskandar, K A, Hanna, A S and Lotfallah, W (2019) Modeling the performance of healthcare construction projects. Engineering, Construction and Architectural Management, 26(09), 2023–39.

Jin, R, Zou, P X, Li, B, Piroozfar, P and Painting, N (2019) Comparisons of students’ perceptions on BIM practice among Australia, China and UK. Engineering, Construction and Architectural Management, 26(09), 1899–923.

Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(09), 2060–83.

Lavikka, R H, Kyrö, R, Peltokorpi, A and Särkilahti, A (2019) Revealing change dynamics in hospital construction projects. Engineering, Construction and Architectural Management, 26(09), 1946–61.

Lee, C (2019) Financing method for real estate and infrastructure development using Markowitz’s portfolio selection model and the Monte Carlo simulation. Engineering, Construction and Architectural Management, 26(09), 2008–22.

Manu, P, Mahamadu, A, Booth, C, Olomolaiye, P O, Coker, A, Ibrahim, A and Lamond, J (2019) Infrastructure procurement capacity gaps in Nigeria public sector institutions. Engineering, Construction and Architectural Management, 26(09), 1962–85.

Marefat, A, Toosi, H and Mahmoudi Hasankhanlo, R (2019) A BIM approach for construction safety: applications, barriers and solutions. Engineering, Construction and Architectural Management, 26(09), 1855–77.

Nadafi, S, Moosavirad, S H and Ariafar, S (2019) Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management, 26(09), 2107–19.

  • Type: Journal Article
  • Keywords: Project management; Estimating; Project cost prediction; Project time prediction; Gray numbers; Uncertainty;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-07-2018-0291
  • Abstract:
    The purpose of this paper is to determine the project completion time and cost under non-deterministic conditions using interval gray numbers (IGNs). Design/methodology/approach The earned value management (EVM) method based on the IGN has been developed. Findings The EVM method based on the IGN has been verified by a numerical example that can be applied to construction projects. Practical implications The EVM method, based on the gray numbers, reduces the budget and time shortage risk. Also, using this method, the managers would not be restricted to provide very exact values in their progress reports in the non-deterministic conditions. Originality/value One notable and significant point in all projects during the execution process is to estimate the project completion time and cost. However, non-deterministic conditions for both planned and actual physical completion percentage of projects have not been considered for predicting the project completion time and cost in the literature. Therefore, the novelty of this paper is the prediction of project completion time and cost under non-deterministic conditions using IGN.

Pantzartzis, E, Price, A and Edum Fotwe, F (2019) Roadmap layers and processes: resilient and sustainable care facilities. Engineering, Construction and Architectural Management, 26(09), 1986–2007.

Panwar, A, Tripathi, K K and Jha, K N (2019) A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects. Engineering, Construction and Architectural Management, 26(09), 1924–45.

Roberts, C, Edwards, D J, Hosseini, M R, Mateo-Garcia, M and Owusu-Manu, D (2019) Post-occupancy evaluation: a review of literature. Engineering, Construction and Architectural Management, 26(09), 2084–106.

Wu, C, Chen, C, Jiang, R, Wu, P, Xu, B and Wang, J (2019) Understanding laborers’ behavioral diversities in multinational construction projects using integrated simulation approach. Engineering, Construction and Architectural Management, 26(09), 2120–46.